top of page
7.4 ML Reservoir Installations
▪️Project located in Morong, Rizal
▪️Supply and Installation of Lightning Arrester, 13 Perimeter Lighting Posts, and 9 Handholes with covers
▪️Lightning protection technology to safeguard the reservoir, ensuring uninterrupted operations
▪️Strategically positioned 13 Perimeter Lighting Posts enhancing not only visibility but also contributing to the overall operational efficiency and safety protocols of the facility
▪️9 Handholes equipped with durable covers, facilitating maintenance and inspections with ease
Project Gallery
bottom of page